|
 |
Journal Papers
 | Yang,
B., Geunes, J. (2004). "Inventory and Lead-Time Planning
with Lead-Time Sensitive Demand." Submitted for Publication
to IIE Transactions. |
 | Yang,
B., Geunes, J. (2004). "Heuristic Approaches and Algorithms
for Solving Single Resource Scheduling Problems with Job-Selection
Flexibility." Submitted for publication to Journal of
Combinatorial Optimization. |
 | Yang,
B., Geunes, J., and O'Brien, W. J. (2004). “A heuristic approach
for minimizing weighted tardiness and overtime costs in single
resource scheduling.” Computers
and Operations Research, 31, pp. 1273-1301. |
 | O’Brien, W., R. Issa, J. Hammer, M. S. Schmalz, J. Geunes, and
S. X. Bai. (2002). “SEEK: accomplishing enterprise information
integration across heterogeneous sources,” Journal of
Information Technology in Construction – Special Issue on ICT
Support for Knowledge Management in Construction, 7, pp.
101-124. |
Conference Proceedings
 | J. Hammer and W. O'Brien, "Future Force and First Responders:
Building Ties for Collaboration and Leveraged Research and
Development." To appear in 24th Army Science Conference,
Orlando, FL, December 2004. |
 | Yang,
B., Geunes, J. "Models for Integrated Inventory and Lead-time
Planning." In Proceedings of the 2004 IIE Research
Conference. 2004. |
 | J. Hammer and W. O'Brien, "A Case Study of Information
Integration Problems in First Responder Coalitions." To appear
in Third International Conference on Knowledge Systems for
Coalition Operations (KSCO-2004), Pensacola, FL, October 2004. |
 | A. Jiang, R. Issa, and W. O'Brien. "Using the Analytical
Hierarchy Process to Design a Construction Supply Chain."
In Proceedings of the European Group for Intelligent Computing in
Engineering (EG-ICE), Weimar, Germany, May 31-June 1, 2004. |
 | A. Jiang, W. O'Brien, and R. Issa. "Construction Supply
Chain Performance Management." In Proceedings of the 4th
ASCE International Symposium on Information Technology in Civil
Engineering, (CD-ROM), I. Flood (Ed.), Nashville, TN, November
15-16, 2003. |
 | W. O'Brien, R. Issa, and I. Flood. "Moving from Information
Tunnels to Configurable, User-model Driven Environments: A Vision
for Future Project Information Technologies." In Proceedings
of the Fourth Joint International Symposium on Information
Technology in Civil Engineering, Nashville, TN, November 15-16,
2003, 10 pages. |
 | W. O'Brien, R. Issa, R. Castro-Raventos, J.Choi, and J. Hammer
(2003). "Inducting subcontractors process ontologies:
Challenges, methods, and illustrative results." In Proceedings
of ASCE Construction Congress 7, Honolulu, Hawaii, March 19-21,
2003, 8 pages. |
 | J.
Hammer, M. Schmalz, and W. O’Brien. "Scalable
Knowledge Extraction from Legacy Sources with SEEK." NSF/NIJ
Symposium on Intelligence and Security Informatics, Tucson,
Arizona, June 2003, 5 pages.
Reprinted in H.Chen, R. Miranda, D. Zeng, C. Demchak, J.
Schroeder, T. Madhusdan (eds.). Lecture Notes in Computer Science
2665: Intelligence and Security Informatics, Springer-Verlag,
Berlin, pp.346-349. |
 | O'Brien,
W., and J. Hammer. (2001). “Robust mediation of construction
supply chain information.” ASCE
Specialty Conference on Fully Integrated and Automated Project
Processes (FIAPP) in Civil Engineering, Blacksburg, VA,
September 26-28, 2001, pp. 415-425.
|
Book Chapters
 | J.
Hammer and W. O’Brien. "Enabling
Supply-Chain Coordination: Leveraging Legacy Sources for Rich
Decision Support." In
Applications of Supply Chain Management Research, Joe Guenes,
E. Akçalý, P.M. Pardalos, H.E. Romeijn, and Z.J. Shen, editors. Kluwer Science Series in Applied
Optimization. pp. 1-47. (accepted
for publication in 2004.) |
 | W.
O'Brien and L. Soibelman. "Technology and Engineering
Dimensions: Collecting and Interpreting New Information for Civil
and Environmental Management." In Digital Infrastructures:
Enabling Civil and Environmental Systems Through Information
Technology, R. Zimmerman and T. Horman, editors. Routledge.
(accepted for publication in 2004.)
|
 | W.
O'Brien, R. Issa, Z. Shen, and H.Xie. "Configurable
Environments: A Vision for Future Project Information
Technologies." In Knowledge Management in the Construction
Industry: A Socio-technical Perspective, S. Kazi, editor.
(accepted for publication in 2004)
|
Working Papers and Technical Reports
 | W.
O'Brien. "Enabling Technologies for Project Supply CHain
Collaboration." Invited White Paper for the NSF/ICIS
Infrastructure and Information Technology Workshop, June 25-27,
2000, Arlington, VA, 4 pages. |
Student Theses
 | Bibo, Yang (2004 expected). Models and Algorithms for
Operations Scheduling Problems with Resources Flexibility and
Schedule Disruptions. Ph.D. Thesis. Department of Industrial
Engineering, University of Florida. |
 | Topsakal, Oguzhan. (2003). Extracting Semantics from Legacy
Sources Using Reverse Engineering of Java Code with the Help of
Visitor Patterns. M.S. Thesis. Department of Computer and
Information Science and Engineering, University of Florida. |
 | Shekar, Sangeetha. (2003). Scalable Knowledge Extraction from
Legacy Sources. M.S. Thesis. Department of Computer and
Information Science and Engineering, University of Florida. |
 | Choi,
Jaehyun.
(2002). Foundations of a Subcontractor Resource Management
Ontology. M.S.
Thesis. M.E. Rinker, Sr. School of Building Construction, University
of Florida. |
 | Haldavnekar, Nikhil. (2002). An Algorithm and Implementation
for Extracting Schematic and Semantic Knowledge from relational
Database Systems. M.S. Thesis. Department of Computer and
Information Science and Engineering, University of Florida. |
 | Castro-Raventós,
R. (2002). Comparative Case Studies of Subcontractor Information
Control Systems. M.S.
Thesis. M.E. Rinker, Sr. School of Building Construction, University
of Florida. |
 | Lu, Huanqing. (2002). Implementation of an Advanced Transaction
Model for an Integrated Computing Environment for Building
Construction. M.S. Thesis. M.E. Rinker, Sr. School of Building
Construction, University of Florida.
|
|
|